SR 316 FROM E OF FENCE ROAD TO W OF SUGARLOAF PKWY
Project ID: 0013897 Notice to Proceed Date:
Project Manager: Bridget Deloris Thomas Construction Percent Complete: %
Office: Program Delivery Current Completion Date:
County: Gwinnett Work Completion Date:
Congressional District: 007, 009 Construction Contract Amount:
State Senate District.: 045, 046 Construction Contractor:
State House District: 105 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
This project includes the construction of SR 316 just west of Fence Road to west of Sugarloaf Parkway interchange. This section of limited access arterial includes the interchange at US 29/SR 8 Winder Hwy and reconstruction of Stanley Road to close access to US 29/SR 8 Winder Hwy. The SR 316 interchange with US 29/SR 8 Winder Hwy is an east facing clover interchange due to the existing CSX railroad line to the west. US 29 / SR 8 Winder Hwy will be raised approximately 28 ft, requiring a bridge to span over SR 316. MSE walls will be used at both US 29 / SR 8 Winder Hwy bridge approaches. Two new bridges (SR 316 EB and WB) will be constructed to span C-D lanes in both directions over existing Colonial Pipeline crossing. The project length is approximately 1.3 miles.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2017$1,016,000.002/26/2020
PE (Preliminary Engineering)2019$4,972,800.002/26/2020
PE (Preliminary Engineering)2020$1,750,000.002/26/2020
PE (Preliminary Engineering)2021$3,122,800.002/26/2020
ROW (Right of Way)2022$21,080,000.0010/21/2021
UTL (Utilities)2025$1,957,060.9812/1/2023
CST (Construction)2025$56,314,599.232/27/2024
Project Search (TransPI) Map
 Project Documents

Approved Concept Reports