SR 316 FROM E OF COLLINS HILL ROAD TO W OF CEDARS ROAD
Project ID: 0013893 Notice to Proceed Date:
Project Manager: Bridget Deloris Thomas Construction Percent Complete: %
Office: Program Delivery Current Completion Date:
County: Gwinnett Work Completion Date:
Congressional District: 009 Construction Contract Amount:
State Senate District.: 045 Construction Contractor:
State House District: 101 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
The proposed project would construct a new, grade separated tight urban diamond interchange (TUDI) on State Route (SR) 316 at Hi Hope Road and would close the existing access to SR 316 at Progress Center Avenue and Wimberly Way. A CD system will be constructed to the outside of the proposed ramps at Hi Hope Road. The west facing CD lanes will connect to existing SR 316 CD lanes at SR 20 with a new westbound auxiliary lane from SR 20 to Collins Hill Road. The east facing CD lanes will connect to SR 316 prior to Cedars Road. Reynolds Road will be realigned parallel to SR 316 and connect at a new intersection on Hi-Hope Road and Hurricane Shoals Road. Access to Wimberly Way from Reynolds Road will be retained. On Hi Hope Road, the project would begin approximately 1,200 linear feet northeast of Hosea Road, and would end approximately 400 feet south of Swanson Drive. A roundabout is proposed at Hi-Hope/Hurricane Shoals Road and Airport Road.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2017$1,628,602.583/9/2018
PE (Preliminary Engineering)2019$6,650,000.003/9/2018
ROW (Right of Way)2020$10,900,000.0012/8/2020
ROW (Right of Way)2022$10,459,000.0012/8/2020
UTL (Utilities)2025$3,560,356.809/22/2023
CST (Construction)2025 1/31/2023
Project Search (TransPI) Map
 Project Documents

Approved Concept Reports