SR 8/SR 316/US 29 @ CR 929/OCONEE CONNECTOR
Project ID: 0013769 Notice to Proceed Date:
Project Manager: Achor Njoku Construction Percent Complete: %
Office: Alternative Delivery Current Completion Date:
County: Oconee Work Completion Date:
Congressional District: 010 Construction Contract Amount:
State Senate District.: 046 Construction Contractor:
State House District: 120, 121 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
SR 316 is a primary east-west corridor in Northeast Georgia, connecting greater Atlanta and the Athens Metropolitan Area. In the section between I-85 in Gwinnett County and SR 10 Loop in Oconee County, access to SR 316 is currently provided by 9 grade-separated interchanges and 33 at-grade interchanges. CR 929/Oconee Connector serves as the primary access road for traffic bound for Watkinsville and points south via US 441. SR 316 is a designated freight corridor. Neither SR 316 nor CR 929/Oconee are part of the GRIP network or state bicycle route system. CR 929/Oconee Connector intersects SR 316 approximately 1 mile west of the existing SR 10 loop interchange and is currently configured as signalized at-grade intersection with slip lanes for all right turning movements. The proposed new interchange is needed to improve connectivity, accommodate expected growth in traffic volumes, and enhance operational traffic conditions in the proposed project area.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2019$4,300,000.004/4/2024
PE (Preliminary Engineering)2023$2,500,000.004/4/2024
ROW (Right of Way)2024$1,730,000.00 
PE (Preliminary Engineering)2025$1,500,000.004/4/2024