0013767
SR 8/SR 316/US 29 @ CR 55/JIMMY DANIEL ROAD
Project ID:
0013767
Notice to Proceed Date:
Project Manager:
Achor Njoku
Construction Percent Complete:
%
Office:
Alternative Delivery
Current Completion Date:
County:
Oconee
Work Completion Date:
Congressional District:
010
Construction Contract Amount:
State Senate District.:
046
Construction Contractor:
State House District:
120
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0013767
Project Description:
The proposed project is located approximately 9.5 miles west of Athens, GA and consists of the intersection of State Route (SR) 8/SR 316/United States (US) and Jimmy Daniel Road. State Route 8/SR 316/US 29 at Jimmy Daniel Road is currently an at grade, signalized intersection that would be reconstructed as a grade separated diamond interchange. For staging purposes, the crossing would be reconstructed slightly east of Jimmy Daniel Road¿s current location. Proposed auxiliary lanes would be constructed parallel to eastbound and westbound SR 8/SR 316/US 29 to provide access between Jimmy Daniel Road and the Oconee Connector. The proposed auxiliary lanes would consist of a single, 12-foot-wide eastbound travel lane and a single, 12-foot-wide westbound travel lane both with 12-foot wide inside shoulder (8-foot paved) and 14-foot-wide outside shoulders (12-foot paved). The total project length would be approximately 1.5 mile.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2022
$4,642,767.51
4/4/2024
ROW (Right of Way)
2024
$2,320,000.00
PE (Preliminary Engineering)
2025
$500,000.00
4/4/2024
CST (Construction)
2025
$41,143,519.00
4/4/2024
CST (Construction)
2026
$83,475,143.00
4/4/2024
CST (Construction)
2027
$75,726,812.00
4/4/2024
CST (Construction)
2028
$11,923,799.00
4/4/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=1e6ea014-de2d-478c-883e-f354cff6e3ed&Filename=0013767_CR_NOV2022.pdf
0013767_CR_NOV2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=1e6ea014-de2d-478c-883e-f354cff6e3ed&Filename=0013767_CR_NOV2022.pdf