SR 8/SR 316/US 29 @ CR 64/MCNUTT CREEK ROAD
Project ID: 0013764 Notice to Proceed Date:
Project Manager: Kesha Wynn Construction Percent Complete: %
Office: Program Delivery Current Completion Date:
County: Oconee Work Completion Date:
Congressional District: 010 Construction Contract Amount:
State Senate District.: 046 Construction Contractor:
State House District: 120 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
The proposed design includes converting the existing at grade intersection of SR 316 and CR 64/McNutt Creek Road in Oconee County, Georgia to a right-in, right-out, at grade ¿slip ramp¿ configuration. The project length will be approximately 2.6 miles from exit sign to exit sign and the proposed construction length will be approximately 0.77 miles and includes at-grade on and off ramps for SR 316 to connect to McNutt Creek Road. The existing at grade crossover will be removed and replaced with a 44-ft depressed grass median section.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2022$1,312,672.682/25/2020
ROW (Right of Way)2026$497,000.00 
CST (Construction)2027$15,379,400.00 