SR 135 @ ALTAMAHA RIVER - TIA
Project ID: 0007037 Notice to Proceed Date:
Project Manager: Anthony T. Tate Construction Percent Complete: 100.00%
Office: Innovative Prog. Delivery Current Completion Date:
County: Jeff Davis, Montgomery Work Completion Date:
Congressional District: 012 Construction Contract Amount:
State Senate District.: 019 Construction Contractor: SCOTT BRIDGE COMPANY, INC.
State House District: 156 Preconstruction Status Report
Project Type: Replacement Construction Status Report
Project Status: Complete More Information...
Right of Way Authorization: Contact Us
Project Description:
The proposed Design Build project will construct a replacement bridge for the existing structurally deficient bridges (Sufficiency Rating = 36.22) over Altamaha River. The preferred alternative (Alternative 2) propose to maintain traffic on existing alignment during construction and then shift traffic to the new bridge west of SR 135. The project typical consists of two (2) 12-foot lanes with a 10-foot rural shoulder with 6.5 foot paved along the roadway and 8-foot along the bridge. The approximate project length is 1.05 miles and is located in Jeff-Davis & Montgomery County with a design speed of 55 mph.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2008$635,000.00 
CST (Construction)2014$1,740,833.0012/6/2017
PE (Preliminary Engineering)2017$1,801,285.45 
CST (Construction)2017$4,709.7212/6/2017
ROW (Right of Way)2019$55,073.235/15/2019
CST (Construction)2019$22,510,666.1512/6/2017