I-285 & SR 400 Improvements

The proposed improvements are designed to aid in reducing traffic congestion and improve safety in the area surrounding the I-285/SR 400 interchange in metro Atlanta. New flyover ramps, new collector-distributor lanes and other facilities to aid east-west travel on along I-285 and north-south travel along SR 400 would be constructed.

The proposed improvements are achieved in two projects:

  • I-285/SR 400 Interchange Reconstruction P.I. # 0000784
  • SR 400 Collector-Distributor (CD) Lanes P.I. # 721850-

Announcements

Finalists have been selected for consideration to design, build and partially finance the Georgia DOT’s I-285 & SR 400 Reconstruction Project.

  • AWH Roadbuilders, LLC
    Contractors: Archer Western Contractors LLC and Hubbard Construction Company
    Engineer: Parsons
  • Dragados-Flatiron-Prince JV
    Contractors: Dragados USA Inc, Flat Iron Constructors Inc, Prince Contracting
    Engineers: Figg Bridge Engineering, Stantec Consulting Services Inc
  • North Perimeter Contractors
    Contractor: Ferrovial Agroman US Corp
    Engineers: The Louis Berger Group Inc, Neel-Shaffer
  • Skanska/Balfour Beatty, a Joint Venture
    Contractors: Skanska, Balfour Beatty Infrastructure Inc
    Engineer: Atkins
 

Project Informaton

In order to achieve maximum efficiency, economic benefit and cost-effectiveness for the region, the Department now proposes to construct the two stand-alone projects as one Design-Build-Finance (DBF), Public-Private Partnership (P3). The combined design-build cost is estimated at $1.056 billion..

Video


Related Projects


 

 I-285/SR 400 Interchange Reconstruction

 

Description

The proposed project aims to improve travel times and safety in the vicinity of the I-285/SR 400 interchange. This project is a priority for the metro Atlanta region and will be advanced through innovative project delivery efforts.

The proposed project is expected to be constructed by Design Build Finance (DBF), Public Private Partnership (P3). The design-build cost of the project is estimated at $725.9 million, which includes the cost of preliminary design, environmental approval, right of way acquisition, final design, construction, utility relocations, construction engineering and inspection (CEI), and insurance.

Project Information

Meeting Documents Date
Welcome PacketThis link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website. | Spanish VersionThis link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website. 2/5/15
Display BoardThis link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website. 2/5/15
New Concept Timing DisplayThis link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website. 2/5/15
Noise DisplayThis link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website. 2/5/15

East Rendering

This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.

West Rendering

This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.

North Rendering

This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.This link will direct you to a non-GDOT website.
 

 SR 400 CD Lanes System

 

Description

The proposed project aims to improve travel times and safety in the vicinity of the I-285/SR 400 interchange by constructing new north-south Collector-Distributor (CD) lanes along SR 400. The proposed project will be let by Design Build Finance (DBF), Public Private Partnership (P3). The design-build cost is estimated at $329.8 million which includes the cost of preliminary design, environmental approval, right of way acquisition, final design, construction, utility relocations, construction engineering and inspection (CEI), and insurance.

Project Information

Drawings

Display 1
View Display 1

 

Contact

Ms. Marlo Clowers, P.E., GDOT Project Manager