SR 316 Corridor
Reconstruction Projects (Gwinnett to Clarke)

Georgia DOT has begun a series of reconstruction projects along SR 316 from SR 20 in Gwinnett County to SR 10 in Athens - Clarke County.  The need for these projects was based on the existing and future traffic congestion and historic crash rates along this corridor.  Once completed, the changes will upgrade sections of SR 316 to a freeway-style corridor, improve traffic conditions and reduce the volume of crashes.  


ACTIVE Projects

316 Project Map

1
SR 316 at Harbins Road

New interchange
Anticipated Construction: Feb 2019

View Info

2
SR 316 at Hi Hope Road

A new interchange and CD system from Wimberly Way to Progress Center Ave.
Anticipated Right-of-Way: Nov 2019
Anticipated Construction: Jul 2021
Project ID: 0013893

View Info

3
SR 316 at Cedars Road

At grade access to SR 316 for SB and NB closure at Cedars Road.
Anticipated Right-of-Way: Jan 2020
Anticipated Construction: Oct 2021
Project ID: 0013894

View Info


4
SR 316 at Hurricane Trail

New interchange for SR 316 at Hurricane Trail and CD system to Fence Road.
Anticipated Right-of-Way: Jan 2021
Anticipated Construction: Oct 2022
Project ID: 0013895

View Info

5
SR 316 at Fence Road

Creates a new location roadway connection between Fence Road to Winder Highway/SR 8/US29.
Anticipated Right-of-Way: Jan 2021
Anticipated Construction: Oct 2022
Project ID: 0013896

View Info

6
SR 316 at SR 8/US 29 Winder Hwy

New interchange for SR 316 at SR 8/US 29 Winder Highway and CD system from Fence Road to 5,000 feet east of SR 8/US 29 Winder Hwy.
Anticipated Right-of-Way: Jan 2021
Anticipated Construction: Oct 2022
Project ID: 0013897

View Info


7
SR 316 at Drowning Creek Road

New interchange for SR 316 at Drowning Creek Road.
Anticipated Right-of-Way: 2025
Anticipated Construction: 2027
Project ID: 0013901

View Info

8
SR 316 at Williams Farm Drive

Removes direct access to SR 316 at Williams Farm Drive and provides frontage roads to allow for SR 316 access at an alternate location.
Anticipated Right-of-Way: 2026
Anticipated Construction: 2027
Project ID: 0013900

View Info

9
SR 316 at Oak Valley Road

Removes direct access to SR 316 at Oak Valley Road and provides frontage roads to allow for SR 316 access at an alternate location.
Anticipated Right-of-Way: 2026
Anticipated Construction: 2027
Project ID: 0013899

View Info



Process Overview

Concept

Develop alternatives to address concerns or issues at an intersection or along a corridor and identify the most viable alternative based on engineering, environmental and cost constraints.

Design

Design engineered drawings based on viable alternative from Concept to set required area needed for property acquisition- Right of Way (ROW). Engineer collaborates with Environmental to avoid, minimize and mitigate impacts to natural and cultural resources adjacent to and within the project limits.

ROW

Acquisition of property and rights needed to implement viable alternative for Construction (CST) based on Design drawings.

CST

Construction of proposed viable alternative. Traffic shifts or detours might be warranted to build the project in a timely manner.


Project Schedule

SR 316 Projects 2019 2020 2021 2022 2023 2024 2025 2026 2027
Hi Hope Road ROW Construction        
Cedars Road   ROW Construction        
Hurricane Trail
    ROW Construction      
Fence Road
    ROW Construction      
SR 8/US 29 Winder Hwy
    ROW Construction    
 
Sugarloaf Pkwy
Concept            
 
Harbins Road
Construction            
Oak Valley
              ROW Construction
Williams Farm Drive
              ROW Construction
Drowning Creek Road
            ROW Construction

Collector-Distributor (CD) Roads

CD Roads provide lanes adjacent to the main freeway for entering and exiting and their primary focus is to move vehicle lane changing onto the CD and off the main freeway. This allows the main freeway to operate more efficiently and reduce the potential for side swipe collisions due to vehicles entering and exiting at multiple locations.

Learn More



Benefits

Reduce Crash Frequency

Reduces the frequency and severity of crashes

Improve Mobility

Improves Mobility

Improve East/West Mobility

Reduce congestion along the corridor



Feedback

Please submit your feedback or request for more information to:

Georgia Department of Transportation
Office of Program Delivery, 25th Floor
600 West Peachtree Street, NW, Atlanta, Georgia 30308
sr316project@dot.ga.gov