SR 20 from I-575 to N. Corners Pkwy
Cherokee/Forsyth

PI: 0009164, 0002862, 0003682, 0014131, 0014132, 0014133

This project is a 20-mile widening of SR 20 from I-575 in Canton to Cumming. Jurisdictions along the corridor include the City of Canton, unincorporated communities of Buffington, Macedonia, Orange, and Free Home in Cherokee County, as well as the unincorporated community of Ducktown and the City of Cumming in Forsyth County.


Virtual Public Meeting​​​​​​

Virtual Public Meeting

An Interactive public meeting is available. As you enter the virtual room there will be multiple boards for you to investigate, including:

  1. Video of the corridor
  2. Intersection Simulations with 360-degree virtual experience
  3. Design Layouts
  4. Schedule
  5. Right of Way status

View Interactive Meeting​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​  View Meeting Flyer​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​

NOTE: The interactive public meeting portal will be available until May 31, 2020.


Project Map

SR 20 from I-575 to NCorners Project Map

View Map



Video Simulation

In order to help you visualize the project, our team has created a video simulation drive through. The video is broken up into 4 sections, so you can watch just the segment that affects you or you can virtually drive from I-575 to North Corners Parkway.


      575atNCorners​​​​​​

      Intersection Simulation

      As part of the SR 20 Improvements Project, a number of intersections are being reconstructed. We have developed a 360-degree rendering for each intersection. To get a better understanding of how these intersections will function, please click on the corresponding number in the map below.

      View Intersection Maps​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​


      Design Concept

      The full concept, showing all project details, can be accessed below.

      Schedule

      SR 20 from I-575 to N Corners Pkwy Schedule

      View Schedule



       ARCHIVES

      Project Documents

      RECENT PROGRESS

      The project team has worked to refine the concept based on traffic analysis, engineering requirements, and public comment. Changes to the project concept include:

      • Revised locations of multiple RCUTs
      • Removed median U-Turn (MUT) intersections and incorporated traditional intersections at Bethelview and Post Roads
      • Revised and added truck turn around locations
      • Revised multiple detention pond locations and sizes

      For a detailed listed of specific concept changes, click here.

      Project Update Flyer

      Next Steps
      • Complete final design
      • Complete ROW acquisition
      • Begin construction on project PI 009164, which spans from I-575 to Scott Road in Cherokee County.
      SCOPE
      • Widening from 2-6 lanes (3 lanes in each direction), variable width raised median (min 20 ft.)
      • Urban shoulders with curb and gutter, 5ft sidewalks
      • Turn lanes at major driveways & intersections
      • R-cuts for turnaround to opposite direction, full median breaks at key locations, & signals at major intersections

      Benefits

      Alleviate Congestion

      Alleviate Congestion

      Reduce Crash Frequency

      Reduce Crash Frequency

      Improve East/West Mobility

      Improve East/West Mobility


      Feedback

      Please submit your feedback or request for more information to:

      Georgia Department of Transportation
      Bryan Lott, Project Manager
      Office of Program Delivery, 25th Floor
      600 West Peachtree Street, NW, Atlanta, Georgia 30308
      SR20Improvements@dot.ga.gov