Home -> Projects -> Project Info -> Suggest A Quick Fix

Suggest A Quick Fix: Quick Response Projects

The Quick Response Project Program allows Georgia DOT to quickly identify, approve and construct small traffic operations safety projects on the state route system.  If you have a suggestion for a quick fix project, please share your thoughts in the form below.

52

Publically Owned Airports 

Quick Response Projects (FY 15)

5.6M

Airport Takeoffs and Landings 

Quick Response Improvements

 

 ‭(Hidden)‬ Quick Response Projects

Project NumberYearCountyCorridorDescription
S0144682015CrispSR 30/Hwy 280

​Right Turn Lane on SR 30/Hwy 280 @ Cannon Road

S0144582015FloydSR 101

​Left Turn Lane Northbound on SR 101 @ Spur 101 / Jack Street

S0144692015ForsythSR 9

​Right turn lane on SR 9 @ Francis Road

S0144672015FultonSR 400

​Flex lane on SR 400 NB from Abernathy Road to the North Springs MARTA Ramp

S0144762015Fulton​SR 400

​SR 400 SB @ Holcomb Bridge Road Off-Ramp.

S0144952015FultonSR 70

​Improvements on SR 70 (Fulton Industrial Blvd) at the Eastbound and Westbound I-20 off ramps.

S0144962015Fulton​Buffington Road @ SR 14

​Buffington Road @ SR 14 SP Interchange Improvements. Widen existing ramp from a single lane to two 14 foot lanes, restripe, new signs and guardrail as needed.

S0144772015GwinnettI-85

​Striping and flex tube delineator barrier on I-85 SB @ SR 316

S0144442015MurraySR 225

​Right turn lane on SR 225 to Spring Place Smyrna Road

S0144622015OconeeSR 10/ US 78

​Intersection Improvement at SR 10 / US 78 @ SR 316 Off Ramp

S0144152015Peach/Fort ValleySR 7

​Left Turn Lane on SR 7 @ SR 96

 Submit Your Suggestion for Quick Fix Projects

Untitled 1